CAL_COVERAGE_SHORT

DataSeen in: RunsCode number 7

What happened

The calendar attached to this run does not cover the run's full date range. Before a run starts, the engine settles every setting it depends on, and a setting that cannot be settled ends the run with this code without testing anything. The engine's own text is in detail.reason.

What to do

Shorten the tested range to fit the calendar, upload a calendar that covers it, or let Forge trim the run to what the calendar covers.

Example

json
{
  "status": "failed",
  "error": {
    "code": "CAL_COVERAGE_SHORT",
    "message": "The engine refused this run's settings before it started.",
    "detail": {}
  }
}

The reply also carries detail.reason, left out of this sample.

Ask about this in the forum